Solvent Extraction Testing Programs by Core Resources

Equipment available for SX process development testwork includes a Bell unit mini pilot plant featuring 8 x 0.2 L mixers and 1 L settlers. Typical throughputs for this plant range from 0.5 – 2 L / h and it is therefore suitable for initial small-scale trails. Larger continuous testwork equipment can be designed and built for specific projects.

Solvent extraction can also be added to other leaching pilots for closed loop circuits. Crystallisation and/or precipitation of loaded strip liquors can also be bolted on the back end of SX testwork/pilots.

Core Resources

Get in touch

36 Corunna Street, Albion, Queensland, 4010, Australia,

+61 7 3637 8100


© Core Resources 2024 | Terms and Conditions

Site by NWO

© Core Resources 2024


Site by NWO