Albion Process™ Presented at Extraction 2018 & Millops 2018

Core and Glencore present the Application of the Albion Process™ for the Treatment of Refractory Ores at Extraction 2018 and MILLOPS 2018

VIEW THE 2018 PRESENTATION FROM EXTRACTION 2018 ABOVE, or DOWNLOAD HERE

Core Resources and Glencore Technology recently held information sessions on the Albion Process™ at Extraction 2018 in Ottawa, Canada and MILLOPS 2018 in Brisbane.

The presentation covered:

  1. Albion Process™ Technology
  2. The GPM project in Armenia
  3. The performance of the Albion Process™ at GPM
  4. A review of global installations
  5. A proven alternative – detailed advantages for Albion Process™ (Gold)

Click here for more information on the Albion Process or contact:

Glencore Technology
Paul Voigt
Manager –Hydrometallurgy
[email protected]
+61 7 3833 8500

Core Resources
David Cavanagh
General Manager – Engineering
[email protected]
+61 7 3637 8100

Share this post:
Facebook
Twitter
LinkedIn
WhatsApp

Discover more articles